Projects

    Mill Bay Excavation, Foundation & Driveway

    Project Location: Mill Bay

    Project Duration: 1 month

    Excavation and foundation work in Mill Bay, with a driveway installed as part of the project. Completed over one month.

    Cobble Hill House & Lot Development

    Project Location: Cobble Hill

    House and lot development in Cobble Hill. This project gallery follows the work from land clearing and excavation through utility trenching, foundation preparation, and backfilling.

    West Shawnigan Land Clearing

    Project Location: West Shawnigan

    Project Duration: 2 days

    Land clearing in West Shawnigan, completed over two days. The photos show the clearing work in progress and the cleared site.

    Garage Addition Foundation & House Underpinning

    Project Location: Shawnigan

    Project Duration: 1 month

    Excavation for a garage addition foundation and underpinning of the existing house.

    Mill Bay Retaining Wall

    Project Location: Kinnoull Cres.

    Project Duration: 04/5/2021 to 04/10/2021

    Client: Tom

    Removed the existing rock wall that was obstructing access to the garage and replaced it with a new concrete retaining wall, significantly improving the flow and accessibility to the garage.

    Additionally, we replaced the old front entry stairs with new concrete stairs and landings, incorporating proper drainable materials to ensure long-term durability and functionality.

    New Cabin Excavation

    Project Location: Shawnigan Lake

    Project Duration: 06/7/2021 to 06/25/2021

    Client: Stevensons

    Excavated the site for a new cabin, completed trenching for utility services, and excavated for the installation of septic tanks and the septic field.

    Shawnigan Transformation

    Project Location: Shawnigan Lake Rd

    Project Duration: 07/01/2024 to 10/15/2024

    Client: Albert

    We began by clearing the site for the new home and constructing an access road to allow truck access to demolish the existing cabin. We then excavated the area for the new house, including blasting where necessary.

    Once the excavation was complete, we backfilled the new foundation and dug to install three septic tanks.

    We also trenched for utility services and built rock and concrete retaining walls to support the landscape. The driveway was then finish-graded, preparing it for paver installation.

    Finally, we demolished a second existing building to create space for the new septic field.

    Footing, Post & Slab

    Project Location: Shawnigan Lake

    Project Duration: 07/18/2022-07/29/2022

    Client: CVRD

    Remove the existing concrete slab and post. Pour new footing and install new post and slab.

    Concrete Pad and Timber Frame Cover

    Project Location: Recreation Rd

    Project Duration: 12/21/2021-04/1/2022

    Client: Lake

    We removed the old concrete slab and stump and regraded the site to prepare for the new slab.

    We then poured the new concrete slab and installed pedestals to support the timber frame structure.

    Using a Cat 305.5 mini excavator, we carefully craned the beams into place, completing the construction of the timber frame cover.

    Customer Reviews

    Great job, on time, picked up right away, easy to communicate with and I would recommend this company.

    BalencedGlue528

    Brad was a pleasure to deal with. Very responsive to my tight timeline.

    James McKenzie

    Good service and great communication! Knows how to dump it!

    Cassy Victor

    Great bin service and excellent communication

    Olaf Gabriel

    Ready To Transform Your Property?

    Get In Touch

    Contact Southall Services today to discuss your project and discover how we can help bring your vision to life. Experience the difference of working with a team that values excellence, reliability, and customer care.